Grouting — Los Angeles, CA

Centinella West

Centinella West
LocationLos Angeles, CA

Project PartnerSkanska USA Civil

ChallengeInstallation of compaction grouting with confined access, overhead restrictions and limited work schedule.

OverviewA newly constructed embankment exhibited significant settlement. A geotechnical engineer designed a compaction grout program consisting of 198 points along each side of a railroad embankment. Each side of the embankment consisted of 100 vertical points, 49 – 15 degree angled points and 49 – 30 degree angled points for a total quantity of 396 compaction grout points to depths of 20 feet each. Additionally, work hours were initially limited to train off-hours (night work).

ResultsCondon-Johnson installed a test program at night and settlements were measured during the test program. The movement was within tolerance and Condon-Johnson was allowed to change work to day shifts while the metro train was in operation. Condon-Johnson utilized a low head room TEI drill and worked off of a wood platform constructed on top with the rail ties on one side of the embankment and on a limited width bike path on the other side of the embankment. Condon-Johnson successfully drilled 8,293 LF and injected 12,135 CF of compaction grout ahead of schedule.