Deep Foundations — Junction City, OR

UPRR Harrisburg Truss Replacement

UPRR Harrisburg Truss Replacement
LocationJunction City, OR

Project PartnerHamilton Construction Co.

ChallengeInstallation of drilled shafts adjacent to an active railway bridge over the Willamette River without interrupting Union Pacific RR trains.

OverviewCondon-Johnson was contracted to install 7 foot diameter drilled shafts up to 200 feet in depth from a temporary work trestle. The new drilled shafts were adjacent and deeper than the existing bridge foundations which were still carrying the load of 20 to 24 trains per day.

ResultsCondon-Johnson’s experienced personnel oscillated full depth temporary casing to safely and efficiently install the drilled shafts, which included 18 each 7 foot diameter drilled shafts ranging up to 149 feet in depth. The project was divided physically by the existing railroad bridge. Hamilton Contractors constructed a temporary work trestle on both sides of the existing bridge to provide access for Condon-Johnson’s service and dig cranes.