LocationOakland, CA
Project PartnerCarmel Partners
ChallengeThe installation of a perimeter auger cast soldier pile / lagging shoring system, site dewatering, and 400 each 18-inch diameter auger cast building support piles up to +140 feet in depth.
OverviewCondon-Johnson was contracted to install a large scope of work in a confined area with a very tight construction schedule.
ResultsCondon-Johnson was able to successfully complete this project ahead of schedule by maintaining a positive working relationship with our project partner and utilizing our key people with the right equipment.